HP+D was responsible for the irrigation master design of the 2.2-mile transit expansion. The project extended the light rail network from 19th Avenue to Metro Center Mall and included a bridge over the I-17 freeway. This project also included 2 Park N Ride facilities, 3 stations, and a transit center. The irrigation system provided low pressure / low water use design for the various landscape materials utilized along the public corridor.