This project includes the final design of the initial stage 29.6 mile mass transit urban rail project in the Phoenix metropolitan area. Project included preparation and coordination of construction plans for Station Finishes, Transit Centers, TPSS / Signals landscape & irrigation site plans, and Town Lake Bridge on this commuter rail project. The starter line of the Metro Rail has 28 stations within 5 line sections traversing the communities of Phoenix, Tempe, and Mesa. Line Section 4 included 3 station platforms with integrated art features by public artists. The 3 stations in Line Section 4 include 38th Street (Gateway Community College), 44th Street (Airport), and Priest (Papago).The landscape design for these stations included low water use trees in a specialty structured soil mix designed to promote plant health. Vines were utilized to aid in cooling the station area and provide seasonal interests. A special group of vines and trees were researched and tested for use on all stations. The pavement patterns and hardscape materials were part of the landscape architecture design. This station has art structured shade canopies at the station entrance ramp.