This project provides a comfortable 1.1 Mile pedestrian corridor that links neighborhood destinations to transit connections such as the Light Rail Station at 12th Street and the I-10 Pedestrian overpass off of Moreland Street. Key features of the project included providing wider 8 ft. sidewalks while retaining the historic pavements and landscape setbacks that are the cultural fabric of the corridor. A feature of this project was to promote pedestrian comfort by providing shade with landscaping. Additional landscaping improves the aesthetics of the corridor and creates a buffer between the vehicular traffic and pedestrians. For comfort and sense of community, pedestrian nodes are designed and strategically located at ¼ mile intervals. The improvements are federally funded through a Federal Transit Administration (FTA) grant and are intended to provide a pedestrian-friendly connector corridor from Moreland to Washington.